STUDENT CODE: MK124224203
Deputy General Manager
ABOUT ME
A highly experienced professional with 18+ years in the power sector with a commitment to continuous
learning and development.
WORK EXPERIENCE
1. Cognos Infra Pvt. Ltd. (Aug 2024 to Present)
Projects: 1) 220 kV GIS Substation, MIDC Rabale, Navi Mumbai. 2) 132 kV GIS Substation, MIDC Rabale,
Navi Mumbai, 3) 220 kV GIS substation bay extension, Thane, Mumbai
2. South East UP Power Transmission Co. Ltd. (Aug 2013 to Aug 2024)
(Resurgent Power Ventures Pte Ltd, a JV of Tata Power & ICICI Venture)
Project: 2X315MVA, 2X100MVA, 2X50MVAR, 1X80MVAR, 400/220/132kV New Substation at Gonda, UP.
Development of Project (From 2013 to 2016):
• Job profile includes Project Development, Statutory Clearances, Monitoring the execution of Supply &
Services Works of EPC Contractor, Civil Works, Erection Activities, Testing & Commissioning of
Substation, Integration of substation to the National Grid.
Additional Responsibility:
• Nodal Officer for SEUPPTCL to represent at NRPC forum (OCC & PSC) for operation & protection related
matters pertaining to COD 1 elements (which includes 790 CKT Kms of 765 & 400 KV Transmission
Lines, two 400 KV & one 765 KV Substations).
• Member of State Power Committee-Uttar Pradesh (SPC-UP) representing SEUPPTCL.
3. KEC International Ltd. (Sep 2012 to Aug 2013)
Project: 1X500MVA, 400/220KV substation Extension at Amritsar for PGCIL
Handled independently Amritsar PKG from establishing Site office, finalizing civil and ETC contractor,
execution and commissioning of 500MVA Transformer 3 month before scheduled time.
4. ABB Ltd. Faridabad. (Apl 2011 to Aug 2012)
Project: 220/132/33 KV(New) substation at Lula Ahir, Rewari of HVPNL
Managed all the aspects of project execution with safety and Quality as Site Manager. Commissioned the entire
substation including the transformer, Equipment and Capacitor bank, TOC obtained from HVPNL.
5. G.E.T. Power (P) Ltd. (June 2009 to Apl 2011)
Project: 400 KV Bay Extension Work of Power Grid Corporation of India Ltd. at Sonepat, Haryana
Worked as Site Manager and commissioned all the 4 bays in our scope and received TOC from client.
6. SPM LTD, Bangalore (May 2008 to June 2009)
Project: Construction of 2 x 100 MVA and 1 x 10 MVA, 220 / 110/ 11 KV New Substation at Sindhanur, Raichur